Bathroom Installations

WC and Bathroom - Lincoln

Remove existing bath, basin, electric shower and wall tiles.
Skim ceiling and install spotlights and fan light.
Relocate pipework for basin and install new pipework to accommodate flush to ceiling shower head valve.
Relocate towel warmer to adjacent wall
Tile throughout, walls and floor incorporating metalic mosaics 

Remove existing WC and wallpaper
Build new box work to accommodate concealed cistern for back to wall WC 
Tile all walls and floor incorporating a metalic mosaic border

Bathroom - Leasingham

Remove existing sanitary ware, wetroom flooring, floor former, shower, radiator and wall tiles.
Install fitted furniture and sanitary ware, new electric shower, enclosure, towel warmer and mirror cupboard.
Tile all walls and floor
Paint ceiling

Heckington

Remove old bathroom suite, chase out floor and walls for new pipework, install low level tray, fitted furniture shower and towel warmer
Skim ceiling, install spotlights and new extractor/light combination
Tile walls, fit grab rails to shower area and hang mirror cabinet

North Hykeham

Remove existing bath, basin and WC
Install new low level walk in shower enclosure, mains shower, basin and WC
Cap off existing radiator and install towel warmer on opposite side of bathroom
Tile walls and floor

Bathroom - Sleaford 

Remove existing bathroom suite
Make good walls
Install new bath, screen, fitted furniture and towel warmer
Tile around bath area


En-suite - Sleaford 

Remove existing en-suite
Skim throughout
Install new low level quadrant enclosure, showerboard, towel warmer and fitted furniture
New full size mirror behind basin

Bathroom and WC - Ruskington

Remove existing bathroom suite and WC
Remove dividing wall and block up existing doorway to bathroom
Relocate radiator
Board and skim ceiling and walls
Install pipework for shower
Install customers own suite and tile throughout 

Bathroom - Sleaford

Remove existing bathroom suite and tiles
Install new P shape shower bath, WC and basin
Tile walls behind bath and half height to remainder of room

En-Suite - Sleaford

Remove existing shower enclosure, WC, basin, radiator, wall tiles and lino
Install new pipework for shower
Install new shower, tray and enclosure
Install new fitted furniture, illuminated mirror cabinets and towel warmer
Tile throughout, walls and floor